| Wildlife | Form: (02 ) 400278719 6/28/2012 | • Perform biological surveys (on-site) for each new development, using the most recent data sets for wildlife and aquatic resources.
• Perform pre-disturbance surveys when the on-site inspection and commencement of disturbance occur in different field seasons using the most recent data sets for wildlife and aquatic resources.
• Utilize the Encana Wildlife Resources Matrix to identify and document (where appropriate) potential impacts or concerns during the project planning phase for proposed drilling operations and construction of roads, pads and pipelines.
• Prohibit Encana employees and contractors from carrying projectile weapons on Encana property, except during company organized events.
• Prohibit pets on Encana property.
• Strategically apply fugitive dust control measures, including enforcing established speed limits on Encana private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources.
• Use enclosed, locking garbage receptacles or implement a strict daily trash removal regime on each temporary or permanent work location. |
| Construction | Form: (02 ) 400278719 6/28/2012 | • Use solar panels as an alternative energy source for on-location production equipment, where appropriate, economically and technically feasible.
• Use multiple gathering lines placed in a single trench to minimize disturbance and construction, where appropriate, economically and technically feasible.
• Install trench plugs (sloped to allow wildlife or livestock to exit the trench should they enter) at known wildlife or livestock trails to allow safe crossing on long spans of open trench, where appropriate, economically and technically feasible.
• Install pipeline crossings at right angles to the drainages, wetlands, and perennial water bodies, where appropriate, economically and technically feasible.
• Limit in-stream construction activity to 24-hours for water bodies less than ten feet wide and to 48-hours for water bodies greater than ten feet wide at locations where horizontal boring is not feasible, where appropriate, economically and technically feasible.
• Maintain a minimum of five feet of soil cover between the pipeline and the lowest point of the drainage or water body channel. |
| General Housekeeping | Form: (02 ) 400614679 7/27/2014 | • Prohibit Encana employees and contractors from carrying projectile weapons on Encana property, except during company organized events.
• Prohibit pets on Encana property.
|
| Wildlife | Form: (02 ) 400614679 7/27/2014 | • Install trench plugs (sloped to allow wildlife or livestock to exit the trench should they enter) at known wildlife or livestock trails to allow safe crossing on long spans of open trench, where appropriate, economically and technically feasible.
• Perform biological surveys (on-site) for each new development, using the most recent data sets for wildlife and aquatic resources.
• Perform pre-disturbance surveys when the on-site inspection and commencement of disturbance occur in different field seasons using the most recent data sets for wildlife and aquatic resources.
• Utilize the Encana Wildlife Resources Matrix to identify and document (where appropriate) potential impacts or concerns during the project planning phase for proposed drilling operations and construction of roads, pads and pipelines.
• Use enclosed, locking garbage receptacles or implement a strict daily trash removal regime on each temporary or permanent work location.
|
| Dust control | Form: (02 ) 400614679 7/27/2014 | • Strategically apply fugitive dust control measures, including enforcing established speed limits on Encana private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources. |
| Construction | Form: (02 ) 400614679 7/27/2014 | • Use solar panels as an alternative energy source for on-location production equipment, where appropriate, economically and technically feasible.
• Use multiple gathering lines placed in a single trench to minimize disturbance and construction, where appropriate, economically and technically feasible.
• Install pipeline crossings at right angles to the drainages, wetlands, and perennial water bodies, where appropriate, economically and technically feasible.
• Maintain a minimum of five feet of soil cover between the pipeline and the lowest point of the drainage or water body channel.
|
| Drilling/Completion Operations | Form: (02 ) 401100213 10/4/2016 | • One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from TD into the surface casing. All wells on the pad will have a
cement bond log with gamma-ray run on production casing (or on intermediate casing
if production liner is run) into the surface casing. The Form 5, Completion Report, for
each well on the pad will list all logs run and have those logs attached. The Form 5 for
a well without open-hole logs shall clearly state “No open-hole logs were run” and shall
clearly identify (by API#, well name & number) the well in which open-hole logs were
run.
|