| Engineer | Form: (02) 400165449 05/19/2011 | 1.)PRODUCTION CASING CEMENT TOP VERIFICATION BY CBL REQUIRED.
2.)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 0 FEET DEEP.
|
| Engineer | Form: (04) 404465153 03/02/2026 | Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet reaction threshold or indicate a deficiency, a new bradenhead test and sundry must be filed. |