| Agency | Form: (02) 400018274 02/03/2010 | 1)24 HOUR SPUD NOTICE REQUIRED. E-MAIL: david.andrews@state.co.us 2)GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS. NOTE: ALL NOTICES SHALL BE GIVEN VIA E-MAIL. SEE ATTACHED NOTICE 3)CEMENT TOP VERIFICATION BY CBL REQUIRED. 4)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 000 FEET DEEP. |
| Engineer | Form: (04) 402835532 10/12/2021 | 1) Complete an MIT during remediation diagnostics and submit results on a Form 21
|
| Engineer | Form: (04) 402868690 12/08/2021 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5
|
| Engineer | Form: (04) 402912275 01/19/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
4) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules.
5) At least one check valve is required for annular spaces that are tied to sales line or separator. Maintain equipment for pressure regulation and check valves in good working order.
6) At least one valve is required to monitor pressure and sample flow from the bradenhead.
7) Within 30 days of completing the work, submit a Form 4 Report of Work Done - Bradenhead Plan
8) Submit a Form 4 Sundry Report of Work Done for the casing repair that was completed in 12/2021
|