| Interim Reclamation | Form: (02 ) 400238109 3/6/2012 | Use of portable toilets whenever long-term activities are occurring onsite. |
| Material Handling and Spill Prevention | Form: (02 ) 400238109 3/6/2012 | • Spill Prevention Control and Countermeasure (SPCC) Plans in accordance with 40 CFR, Part 112.
• Secondary containment for oil and produced water vessels in accordance with COGCC rules.
|
| General Housekeeping | Form: (02 ) 400238109 3/6/2012 | • Waste minimization practices including re-use and recycling when practicable.
• Waste management (handling and disposal) practices in accordance with COGCC rules and RCRA guidelines as applicable.
• Good housekeeping practices relative to overall site condition.
|
| Wildlife | Form: (02 ) 400238109 3/6/2012 | Bird protection practices in accordance with the Migratory Bird Act. |
| Storm Water/Erosion Control | Form: (02 ) 400238109 3/6/2012 | • Stormwater management practices during construction and interim reclamations phases in accordance with CDPHE regulations.
• Stormwater management practices in accordance with COGCC rules throughout the operating life of the locations.
|
| Planning | Form: (02 ) 400238109 3/6/2012 | • Traffic minimization practices whenever possible in order to reduce dust, noise, congestion, road maintenance.
• Noise minimization.
• Use of multi-well pad sites for the purpose of minimizing areas of disturbance, traffic, and environmental impact.
• Proper reclamation and reseeding practices in accordance with COGCC rules, landowner requirements and BLM stipulations as applicable.
|
| Drilling/Completion Operations | Form: (02 ) 400238109 3/6/2012 | • Spill reporting and cleanup per COGCC guidelines, EPA regulations, CDPEH regulations, and Noble Energy Inc. policies. |
| Planning | Form: (02 ) 400854243 11/9/2015 | In compliance with Rule 317.p the first well that is operationally feasible on the 17L pad will be logged with an open-hole Resistivity Log and Gamma Ray Log from TD into the surface casing. All wells on the pad will have a Cement Bond Log with cased-hole Gamma Ray run on the production casing. The Form 5 Completion Report will list all the logs run in the subject well and identify the well that was logged with the open-hole Resistivity Log. |
| Drilling/Completion Operations | Form: (02 ) 400854243 11/9/2015 | Caerus Operating LLC will adhere to the COGCC Policy for Bradenhead Monitoring effective May 29, 2012. |