| Wildlife | Form: (02 ) 400182897 10/6/2011 | Bird protection practices in accordance with the Migratory Bird Act. |
| General Housekeeping | Form: (02 ) 400182897 10/6/2011 | • Waste minimization practices including re-use and recycling when practicable.
• Waste management (handling and disposal) practices in accordance with COGCC rules and RCRA guidelines as applicable.
• Good housekeeping practices relative to overall site condition.
|
| Planning | Form: (02 ) 400182897 10/6/2011 | • Traffic minimization practices whenever possible in order to reduce dust, noise, congestion, road maintenance.
• Noise minimization.
• Use of multi-well pad sites for the purpose of minimizing areas of disturbance, traffic, and environmental impact.
• Proper reclamation and reseeding practices in accordance with COGCC rules, landowner requirements and BLM stipulations as applicable.
|
| Drilling/Completion Operations | Form: (02 ) 400182897 10/6/2011 | • Spill reporting and cleanup per COGCC guidelines, EPA regulations, CDPEH regulations, and Noble Energy Inc. policies. |
| Interim Reclamation | Form: (02 ) 400182897 10/6/2011 | Use of portable toilets whenever long-term activities are occurring onsite. |
| Storm Water/Erosion Control | Form: (02 ) 400182897 10/6/2011 | • Stormwater management practices during construction and interim reclamations phases in accordance with CDPHE regulations.
• Stormwater management practices in accordance with COGCC rules throughout the operating life of the locations.
|
| Material Handling and Spill Prevention | Form: (02 ) 400182897 10/6/2011 | • Spill Prevention Control and Countermeasure (SPCC) Plans in accordance with 40 CFR, Part 112.
• Secondary containment for oil and produced water vessels in accordance with COGCC rules.
|
| Drilling/Completion Operations | Form: (02 ) 400850668 10/16/2015 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from TD into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |