| Engineer | Form: (02) 400395047 04/02/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) APPROVAL OF THIS FORM DOES NOT AUTHORIZE INJECTION. AUTHORIZATION TO INJECT REQUIRES APPROVAL OF FORM 31 AND FORM 33.
(4) BEFORE STIMULATING WELL, CAPTURE WATER SAMPLE FROM THOSE FORMATION(S) REQUESTED FOR INJECTION AND ANALYZE FOR TOTAL DISSOLVED SOLIDS. SUBMIT LAB ANALYSIS TO DENISE ONYSKIW AT DENISE.ONYSKIW@STATE.CO.US.
(5) cement volume shall be sufficient to provide coverage from TD up past intermediate shoe by 200'. Verify with CBL. |
| Permit | Form: (05) 400538671 02/14/2014 | Passes Permitting: Reports remedial squeeze of 12-19-13. Also reports Welllock squeeze of 11/18/13. Cement reports on both squeezes attached.
|
| Engineer | Form: (04) 400565036 03/08/2014 | If a new cement top results from this work, then Submit a form 5 - Drilling Completion Report that depicts the new cement top on the production casing. |
| Engineer | Form: (04) 403715550 03/13/2024 | 1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
3) Complete a Form 21 MIT to verify repairs for injection wells |