| Engineer | Form: (04) 403474013 10/19/2023 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method.
2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
4) Complete installation of BH monitoring system by 4/19/2023 |
| Engineer | Form: (04) 404372407 04/28/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Bradenhead gas is not to be vented to the atmosphere. Shut in bradenhead pressure shall not exceed threshold pressure. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
3. No later than 6/2/2026, (12 months after the most recent BH test) conduct a bradenhead test, submit a Form 17 within ten days of the test.
Within 60 days of conducting the Bradenhead test, submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and SCADA pressure data.
|