WELL05-045-16103PUCKETT
21A-24D
QB ENERGY OPERATING LLC
10844
PA
12/7/2022
GRAND VALLEY
31290
GARFIELD  045
NWNW 24 6S97W 6
335518View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (06)
403019589
06/02/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
PermitForm: (06)
403019589
06/29/2022
Submit a form 5A to report the bridge plug identified on the wellbore diagram attached to the Notice of Intent. Include a wireline ticket. This Form 5A must be submitted within 30 days for compliance with Rule 416.
EngineerForm: (06)
403019589
07/05/2022
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 2) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 3) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 4) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 5) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging or annual test has not been completed. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
EngineerForm: (04)
403157654
10/06/2022
1) If well is not plugged by 12/31/2022 please complete a MIT and submit the results on a Form 21. MIT is required to be completed by 12/31/2022
 