| Engineer | Form: (05) 2555577 02/10/2011 | no APD(s) in wellfile (for comparison of permitted vs. actual) |
| Engineer | Form: (04) 404364740 09/30/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue- 03/13/2026. Pressure is to be managed and mitigated until repair or plugging is complete. Summary of well monitoring and mitigation will be submitted on a Form 4 Sundry within 30 days of the well being cut and capped or repaired. The sundry should include monthly pressure monitoring data, flow rate information, sample analysis interpretation, and bradenhead test description.
3. Shut in bradenhead pressure shall not exceed threshold pressure.
|