| Drilling/Completion Operations | Form: (02 ) 400723088 12/3/2014 | During the Wasatch recompletion operations, OXY will monitor the bradenhead pressure of the wells listed in COA#3. The wells are monitored by our SCADA system, and the bradenhead pressures will be continuously monitored during the recompletion operations. If a bradenhead pressure reaches 200 psi above the baseline pressure for that specific well, the recompletion operations will be shut down, a Form 42 will be submitted within 24 hours and plans will be made to remediate the well with the high bradenhead pressure. |