| Engineer | Form: (04) 403529108 10/19/2023 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method.
2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
3) Complete installation of BH monitoring system and repair by 4/19/2023
|
| Engineer | Form: (04) 403877450 03/17/2025 | No later than 6/15/2024, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the new proposed mitigation plan due to continuous flow at the end of the test, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data. |
| Engineer | Form: (04) 403877450 03/17/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
3. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
|
| Engineer | Form: (04) 404357185 10/08/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. No later than one year from annual BH test date , conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, and the flow rate information and pressure data.
3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
|