Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-15341N. PARACHUTE
EF16C-19 I30 59
QB ENERGY OPERATING LLC
10844
PR
1/1/2021
GRAND VALLEY
31290
GARFIELD  045
NESE 30 5S95W 6
335588View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403351298
03/27/2023
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 5) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan 6) Complete installation of BH monitoring system by 7/17/2023
 
COGIS - Best Management Practice Results
No records to display.