Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-15109N. PARACHUTE
MF16C-21 C28 69
QB ENERGY OPERATING LLC
10844
TA
5/25/2021
GRAND VALLEY
31290
GARFIELD  045
NENW 28 6S96W 6
335200View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
402698256
05/26/2021
1) This approval is good for one year and a new application must be made before 2/22/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting from 3/2020 to present to TA.
EngineerForm: (04)
402938900
04/18/2022
1) Effective Apr 30, 2022 this well will be designated inactive and must be properly returned to production, plugged, have an approved 5B or added to a Form 6A list no later than November 1, 2022. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting from SI to TA 1/2021,3/2021,4/2021 3) Submit a current Wellbore Diagram on a Form 4 Sundry
PermitForm: (06)
403790421
05/22/2024
Submit a form 5A to report the bridge plug identified on the wellbore diagram attached to the Notice of Intent. Include a wireline ticket. This Form 5A must be submitted within 30 days for compliance with Rule 416.
OGLAForm: (06)
403790421
05/23/2024
Due to proximity to a wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water.
EngineerForm: (06)
403790421
07/24/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) After placing plug at 1950’ assure that all fluid migration has been eliminated by monitoring the well for a minimum of 4 hours before proceeding to the next plug. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact ECMC engineering before continuing operations. 3) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 4) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 5) Prior to placing surface shoe plug verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 6) If applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for ECMC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 7) Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. 8) With the Form 6 SRA operator must provide written documentation, which positively affirms each COA listed above has been addressed. 9) Operator shall notify ECMC engineering staff of changes to the approved plugging plan or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate ECMC contact is Diana Burn at 303-918-6320.
 
COGIS - Best Management Practice Results
No records to display.