| Engineer | Form: (02) 400338709 10/31/2012 | COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
|
| Permit | Form: (06) 401690953 08/09/2018 | COA: Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days. |
| Engineer | Form: (06) 401690953 08/10/2018 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Check bradenhead pressure prior to MIRU. Perform a bradenhead test if pressure is greater than 50 psi and submit results electronically on a Form 17.
3) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. |