| Engineer | Form: (04) 404445864 03/02/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue- 8/5/25. Pressure is to be managed and mitigated until repair or plugging is complete. |