| Engineer | Form: (04) 400507647 12/02/2013 | OPR can vent BH through a hard line to a tank for 90 days. Record BH pressure at conclusion of venting period. Shut well in for 48 hours. Record BHP and report to COGCC. Additional venting and/or remediation may be required.
Send the BHP information to David Andrews (COGCC). |