TypeSource DocumentConditions of Approval
EngineerForm: (04)
402073270
07/16/2019
This approval is good for one year and a new application must be made before June 13, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402309520
10/19/2020
1) This approval is good for one year and a new application must be made before 02/11/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
402594402
03/23/2021
1)This approval is good for one year and a new application must be made before 2/11/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402937758
02/09/2022
Comment 1) This approval is good for one year and a new application must be made before 12/18/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Review production reporting and correct applicable months
OGLAForm: (06)
403741490
04/10/2024
This oil and gas location is located within a CPW-mapped 500 foot buffer of the Ordinary High Water Mark of the West Fork Parachute Creek for protection of Aquatic Native Species Conservation Water High Priority Habitat. At a minimum, Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water.
OGLAForm: (06)
403741490
04/10/2024
Due to proximity to a wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers.
PermitForm: (06)
403741490
04/11/2024
Submit a form 5A In order to resolve completed interval information uncertainties. This Form 5A must be submitted within 30 days for compliance with Rule 416.
EngineerForm: (06)
403741490
05/02/2024
1)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 3)Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 4)Prior to placing surface shoe plug verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 5)If applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for ECMC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 6)Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. 7)With the Form 6 SRA operator must provide written documentation, which positively affirms each COA listed above has been addressed. 8)Operator shall notify ECMC engineering staff of changes to the approved plugging plan or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate ECMC contact is Byron Gale at 970-319-4194.
 