Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-13334BRYNILDSON
29-3(C29NE)
QB ENERGY OPERATING LLC
10844
PR
4/5/2005
MAMM CREEK
52500
GARFIELD  045
NENW 29 6S92W 6
335361View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
404323388
08/26/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Prior to starting bradenhead mitigation, if a sample has not been collected within the last twelve months collect bradenhead and production gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples. 3. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for twelve consecutive months from the date test reported on the Form 17. 4. No later than one year from annual BH test date , conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of blowdowns from previous year, the future plans, sample analysis interpretation, and the flow rate information and pressure data.
EngineerForm: (04)
404323388
08/26/2025
Shut in bradenhead pressure shall not exceed threshold pressure.
 
COGIS - Best Management Practice Results
No records to display.