| Engineer | Form: (04) 404183190 05/19/2025 | 1) Well last produced 8/2024 and has been designated as Inactive. Within 6 months of a Well becoming Inactive action must be taken. No later than 6 months from inactive designation this well must:
A. Be plugged and Abandoned,
B. Return to production so that it is no longer an Inactive Well,
C. Have an approved Form 5B, Inactive Well Notice,
D. Be designated as Out of Service by submitting a Form 6A, Out of Service Designation.
|
| OGLA | Form: (04) 404495134 01/26/2026 | Due to proximity to surface water, operator will use secondary containment for all tanks and other liquid containers. Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water. |
| Engineer | Form: (04) 404495134 04/23/2026 | 1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5 and/or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations
4) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
5) Complete a pressure test to verify repairs. Submit documentation of the pressure test on the applicable post-work ECMC form.
|