| Engineer | Form: (04) 404389303 12/11/2025 | Liquids Flow:
1. Check the respective "Character of Intermediate fluid" box on future Form 17 submissions
2. Provide details on liquid flow and include volumes in annual sundry updates |
| Engineer | Form: (04) 404389303 12/11/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. No later than 5/19/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The well should be shut in for seven days to monitor and collect data to characterize build up pressures prior to conducting the bradenhead test. The sundry should a revised plan for the intermediate casing, sample analysis interpretation, details on liquid flow, test descriptions, flow rate information and pressure data.
3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
4. If a sample has not been collected from surface and production casing within the last twenty – four months collect gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
|