| Engineer | Form: (04) 400507967 12/02/2013 | Vent off high BHP via a hard-line to a tank for 90 days. Take/record BHP at that time (conclusion of venting). Shut-in well for 48 hours. Record BHP @ conclusion of shut-in period and furnish results to COGCC.
Notes: BHP currently = 200 psi. top perf = 5276'. COGCC TOC = 5225'. |
| Engineer | Form: (04) 400629379 08/05/2014 | starting 8/6/2014 vent bradenhead thru' hard line to a tank for 90 days (11/6/2014). shut well in for 24-hours, report the resulting pressure to COGCC |
| Engineer | Form: (04) 400749227 12/15/2014 | Approval for 90 day venting is granted.
Shut-in well for 48 hours after 90 days. Record BHP @ conclusion of shut-in period and furnish results to COGCC.
Comply with all applicable CDPHE rules and regulations. |