| Engineer | Form: (04) 400507961 12/02/2013 | BHP = 540 psi.
Vent off high BHP through a hard-line to a tank for 90 days. Record BHP (if any) at that time. Shut-well in for 48 hours. Record 48-hour build-up BHP and report to COGCC. Add'l venting and/or remediation may be required. |
| Engineer | Form: (04) 400749263 12/15/2014 | Approval for 90 day venting is granted.
Due to rapid blowdown time reported on 12/31/2013 (doc#2122053) verify that their is not a buried valve that is closed.
Shut-in well for 48 hours after 90 days. Record BHP @ conclusion of shut-in period and furnish results to COGCC.
Comply with all applicable CDPHE rules and regulations.
|