Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-12145CHEVRON
1B-8D
QB ENERGY OPERATING LLC
10844
SI
11/1/2025
GRAND VALLEY
31290
GARFIELD  045
SWNW 8 6S96W 6
335582View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EnvironmentalForm: (04)
400707319
11/20/2014
Notes: Partially buried tank (PBT) removal from Chevron 1B-8D (Location ID #335582) was part of a group of PBT closure program approved under REM #8164. During tank removal a historical spill was identified and reported on 4/15/2014 on Form 19 doc #2148555 (open as of today). In Situ treatment was proposed originally (6 months ago). This E-Form 04 is approved with the following Conditions of Approvals: Before moving the impacted material, please submit via e-form 04 the following information: 1) Volume of impacted material to be moved to Caerus Chevron 31B-7D (Facility ID #335652) and to Garden Gulch C.S. (Facility ID #417558) respectivelly (volume to each site). 2) Latest analytical results from impacted material to be treated. 3) Assuming the method is landfarming (otherwise specify and describe alternative method), submit brief E&P Waste Management Plan: Approximate surface anticipated to be used for landfarming, thickness, landfarming procedure (tiling, moisture, aditives, etc.), stormwater management previsions (Compacted berms, etc.) 4) Timeline. Form 19 was submitted in May, 2014. Caerus is proposing to do ex-situ treatment in November, 2014. What is the timeline for treatment activities (understanding that landfarming is not a practical option for winter)?
 
COGIS - Best Management Practice Results