Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-12067CHEVRON
36-5D
QB ENERGY OPERATING LLC
10844
PR
7/6/2010
GRAND VALLEY
31290
GARFIELD  045
SWSE 36 5S96W 6
335658View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400507970
11/29/2013
Operator has COGCC concurrence to vent the bradenhead. This is preferably done via a hard line to a tank. Berry can vent for 90 days. After the venting period, shut the well in for a 24-hour period (or longer, up to 48 hours). Notify COGCC what the bradenhead-pressure (BHP) and shut-in duration are. We may have to discuss remediation if the BHP has not sufficiently dissipated.
EngineerForm: (04)
400617070
07/02/2014
opr attached the two gas analyses requested on a May 2010 Sundry, request to vent, in which K King (COGCC) requested samples (analyzed) of the bradenhead and of the tubing. the two samples are of different sources. Remediation should be done.
 
COGIS - Best Management Practice Results
No records to display.