| Engineer | Form: (04) 404611079 04/15/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue- 02/11/2026. Pressure is to be managed and mitigated until repair or plugging is complete. If it is determined that there is no integrity issue, provide the diagnostic information on the Form 4 BHP that supports this conclusion, including monthly pressure monitoring data.
3. Shut in bradenhead pressure shall not exceed threshold pressure.
|