| Engineer | Form: (04) 403364015 04/12/2023 | 1) Complete repair work or P&A well by 9/7/2023 (6 months from the date of identifying the integrity issue) |
| Engineer | Form: (04) 403384844 05/09/2023 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) Complete a bradenhead test following completion of the repair and submit results on a Form 17 or directive approved method
3) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run
|
| OGLA | Form: (04) 403384844 05/09/2023 | Operator will control all emissions and fluids during casing repair operations. |