COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401794304
11/02/2018
1)Provide 48 hour notice of plugging MIRU via electronic Form 42. 2)Check bradenhead pressure and perform a bradenhead test prior to MIRU if the pressure is greater than 50 psi. Submit results electronically on a Form 17 and contact COGCC Area Engineer. 3)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. 4)This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. 5) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
402021262
05/13/2019
1)Provide 48 hour notice of plugging MIRU via electronic Form 42. 2)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. 3)This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. 4)Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. 5)Do not install surface casing shoe plug unless the surface casing pressure (bradenhead) and production casing pressure is zero. If there is pressure contact COGCC Engineer, additional deeper plug(s) will be required to ensure no surface casing (bradenhead) and or production casing pressure exist. 6)Tag plug at surface casing shoe no deeper than ~2,574’. 7)Visually confirm returns to surface in 4.5" production casing as well as annulus between the 4.5" production casing and the 8.625" surface casing.
 