Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-10488BRYNILDSON
13B-20-692
TEP ROCKY MOUNTAIN LLC
96850
PR
5/1/2025
MAMM CREEK
52500
GARFIELD  045
NWSW 20 6S92W 6
335379View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (04)
404051264
01/14/2025
This oil and gas location is within a Mule Deer Winter Concentration Area and Mule Deer Severe Winter Range High Priority Habitat. Well completion activities should not take place from December 1 to April 30. If activities must take place from December 1 to April 30, operator will consult with CPW to determine site-specific measures to avoid, minimize, and mitigate adverse impacts to wildlife and the environment. At a minimum, operations with heavy machinery will not start before 8 a.m. and will cease at 4 p.m.
EngineerForm: (04)
404051264
01/16/2025
Complete repair work or P&A well within 6 months of identifying the failure
EngineerForm: (04)
404051264
01/16/2025
1) For applicable operations , report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
EngineerForm: (04)
404035179
01/20/2025
1. Repair or plug well within 6 months of discovering the integrity issue 2. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04)
404242335
07/08/2025
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet reaction threshold or indicate a deficiency, a new bradenhead test and sundry must be filed.
EngineerForm: (04)
404242335
07/08/2025
For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
 
COGIS - Best Management Practice Results
No records to display.