Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-10461LINDAUER
3-10 (OO3)
QB ENERGY OPERATING LLC
10844
SI
6/1/2025
GRAND VALLEY
31290
GARFIELD  045
SWSE 3 8S96W 6
334105View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403555050
11/15/2023
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) Complete installation of BH monitoring system as soon as parts are available
EngineerForm: (04)
403901677
09/03/2024
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 3. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months from the date test reported on the Form 17. 4. At the conclusion of the six months (3/3/2025), conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, diagnostics on the source and casue of the gas, and the flow rate information and pressure data.
EngineerForm: (04)
403901677
09/03/2024
Shut in bradenhead pressure shall not exceed threshold pressure.
EngineerForm: (04)
404352300
12/03/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. No later than 7/7/2026 , conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, and the flow rate information and pressure data. 3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
 
COGIS - Best Management Practice Results
No records to display.