| Engineer | Form: (02) 400068356 07/26/2010 | 24 HOUR SPUD* NOTICE REQUIRED. (* THIS IS NOT A 'SPUD' PER SE, HOWEVER, NOTIFY THE COGCC BEFORE THIS WORK COMMENCES). E-MAIL: Mike.Longworth@state.co.us ALSO E-MAIL: Shaun.Kellerby@state.co.us
THE MOISTURE CONTENT OF ANY DRILL CUTTINGS OR COMPLETION (E.G. FRAC-) MATERIAL IN A PIT, TRENCH, OR PILE SHALL BE AS LOW AS PRACTICABLE TO PREVENT ACCUMULATION OF LIQUIDS GREATER THAN DE-MINIMIS AMOUNTS. AT THE TIME OF CLOSURE, THE CUTTINGS AND COMPLETION MATERIALS MUST ALSO MEET THE APPLICABLE STANDARDS OF TABLE 910-1. |