| Engineer | Form: (04) 401881084 02/25/2019 | 1)This approval is good for one year and then a new application must be submitted. Updates for the planned utilization of the well should be included with the application.
2)A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
3)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402308571 10/26/2020 | 1) This approval is good for one year and a new application must be made before 02/11/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402591689 03/10/2021 | 1) This approval is good for one year and a new application must be made before 2/10/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402938137 02/09/2022 | 1) This approval is good for one year and a new application must be made before 2/10/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting from 5/2015 forward.
3) Submit a current Wellbore Diagram on a Form 4 Sundry |
| Engineer | Form: (04) 403003821 04/04/2022 | 1) Plug and abandon well by 12/31/2022 |
| OGLA | Form: (06) 403068438 06/07/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. |
| Permit | Form: (06) 403068438 06/07/2022 | Submit a form 5A In order to resolve completed interval information uncertainties This Form 5A must be submitted within 30 days for compliance with Rule 416. Williams Fork and Corcoran formations need corrected. |
| Engineer | Form: (06) 403068438 06/07/2022 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.
2) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
3) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard.
4) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
5) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
6) This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate COGCC contact is Craig Burger at 970-319-4194. |
| OGLA | Form: (06) 403479267 08/07/2023 | Due to proximity to a mapped wetland and surface water, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water. |
| Engineer | Form: (06) 403479267 08/28/2023 | 1)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l.
2)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
3)Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard.
4)With the Form 6 SRA operator must provide written documentation, which positively affirms each COA listed above has been addressed.
5)This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate COGCC contact is Craig Burger at 970-319-4194. |