| Engineer | Form: (04) 403938165 01/28/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. By 7/30/2025 , conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, and the flow rate information and pressure data.
If well has continuous flow at end of BH test, propose updated mitigation plan on Form 4 Sundry.
3. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
|
| Engineer | Form: (04) 404396742 03/11/2026 | 1.Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2.No later than 7/7/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, flow rate information and SCADA pressure data.
3.Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
|
| Engineer | Form: (04) 404600823 04/28/2026 |
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Bradenhead gas is not to be vented to the atmosphere. Shut in bradenhead pressure shall not exceed threshold pressure. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
3. No later than 3/10/2027, (12 months after the most recent BH test) conduct a bradenhead test, submit a Form 17 within ten days of the test.
Within 60 days of conducting the Bradenhead test, submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and SCADA pressure data.
|