| Engineer | Form: (02) 400640917 08/12/2014 | (1) Operator shall comply with the most current revision of the Northwest Notification Policy. See attached notice.
(2) Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1). See attached notice.
(3) Operator shall comply with the most current revision of the Mamm Creek Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1). See attached notice.
(4) Operator shall comply with the Notice to Operators Drilling Wells in the Buzzard, Mamm Creek, and Rulison fields, Garfield County and Mesa County – Procedures and Submittal Requirements for Compliance with COGCC Order Nos. 1-107, 139-56, 191-22, and 369-2 (July 8, 2010). See attached notice.
(5) Operator shall provide cement coverage from the production casing shoe (5+1/2" first string) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log. This requirement shall supersede the top of cement requirements in the Mamm Creek Field Notice to Operators.
(6) Approval of this form does not authorize injection. Authorization to inject requires approval of Form 31 and Form 33.
(7) Before stimulating the objective injection formation(s), collect water sample(s) and analyze for Total Dissolved Solids. Prior approval of Form 4 is required for step rate and injectivity tests.
|
| Engineer | Form: (04) 400689198 09/18/2014 | attached are two copies of the procedures (one is labeled 'wellbore diagram') -- and no "proposed" WBD, as indicated in the engineering tab
9/23: now can view two WBDs but not any procedure doc's ~
opr provided procedure: see wellfile docs, # 2122141 |
| UIC | Form: (02) 400640917 01/21/2015 | 1. For all new drill Underground Injection Control wells a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs is required from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DILS file version of each log is required.
2. For all new and converted Underground Injection Control wells a Cement Bond Log (CBL) is a required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required.
3. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted. |
| UIC | Form: (04) 400689198 04/01/2015 | Injectivity test is limited to 10,000 barrels and 10 days. |
| Engineer | Form: (04) 401881049 02/25/2019 | 1)This approval is good for one year and then a new application must be submitted. Updates for the planned utilization of the well should be included with the application.
2)A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
3)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402308573 10/26/2020 | 1) This approval is good for one year and a new application must be made before 02/11/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402591683 03/10/2021 | 1) This approval is good for one year and a new application must be made before 2/10/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402938099 02/09/2022 | 1) This approval is good for one year and a new application must be made before 2/10/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update production reporting status of all applicable months from 05/2015 forward.
3) Submit a current Wellbore Diagram on a Form 4 Sundry
|
| OGLA | Form: (06) 403010984 05/11/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. |
| Engineer | Form: (06) 403010984 05/16/2022 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.
2) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
3) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard.
4) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
5) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
|