| Engineer | Form: (04) 402472096 11/10/2020 | 1) This approval is good for one year and a new application must be made before 08/20/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402755419 07/23/2021 | 1)This approval is good for one year and a new application must be made before 8/20/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Reporting is incorrect for 3/2021 and 4/2021. Correct production reporting to TA. |
| Engineer | Form: (04) 402907793 12/29/2021 | 1) Complete annual bradenhead testing for 2021 by 7/1/2022. If the wellhead has not be reinstalled by this date due to drilling operation, contact the area engineer with an update.
2) A separate annual bradenhead test is required for 2022. A minimum of 30 days between the delayed 2021 and 2022 tests is required. |