| Engineer | Form: (06) 400663670 08/18/2014 | 1) Plugs added: perforate and squeeze at 3150’ to provide cement coverage to 200’ above the top of the Mesaverde formation and perforate and squeeze at 1500’ to provide cement coverage above the Wasatch G formation. Tag plugs unless squeeze is pumped below a CICR.
2) All plugs must have a minimum of 100' cement left in the casing. For cement retainers that are set 50' above squeeze perfs, a minimum of 50' cement must be placed on top of the retainer. Alternatively, the cement retainers may be moved 100' above the perforations with a minimum of 2 sx cement placed on top of the retainer. |