Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-07528COUEY
8-1 (B8E)
QB ENERGY OPERATING LLC
10844
PA
7/10/2023
MAMM CREEK
52500
GARFIELD  045
NWNE 8 7S92W 6
334786View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (06)
403342004
03/22/2023
The well is located within CPW-mapped Elk/Mule Deer Severe Winter and Winter Concentration HPHs; no plugging and abandonment operations with heavy equipment will be allowed between December 1 and April 30.
OGLAForm: (06)
403342004
03/22/2023
Operator will control all fluids and emissions during plugging and abandonment operations.
OGLAForm: (06)
403342004
03/22/2023
The well is located within CPW-mapped Aquatic Sportfish Conservation Waters; operator needs to have stormwater and erosion control measures in place during plugging and abandonment operations.
PermitForm: (06)
403342004
03/23/2023
Submit form 5A in order to resolve completed interval information uncertainties. Perforations 4192-4484 never reported. This Form 5A must be submitted within 30 days for compliance with Rule 416.
EngineerForm: (06)
403342004
04/05/2023
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 2) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 3) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 4) If applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 5) Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. 6) This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate COGCC contact is Craig Burger at 970-319-4194. 7) Submit any logs run on the Form 6 Subsequent
 
COGIS - Best Management Practice Results
No records to display.