Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-07221TBI PRODUCTION
25-42
QB ENERGY OPERATING LLC
10844
PR
5/1/2025
PARACHUTE
67350
GARFIELD  045
SESW 25 7S96W 6
324002View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400439479
07/01/2013
1.) Notify Dave Andrews (970-456-5262 cell or david.andrews@state.co.us) at least 48 hours prior to MIRU. 2) Run new cement bond log (CBL) to verify remedial cement coverage. 3) Submit new Form 5 (Drilling Completion Report) with remedial cement tickets and remedial CBL within 30 days of the work, and notify Dave Andrews with the eForm Document Number. 4) Perform a Bradenhead Test and record results on Form 17 (Bradenhead Test Report) sometime between 30 to 60 days after the remedial cement work; submit Form 17 and new wellbore diagram within 10 days after the test, and notify Dave Andrews with the eForm Document Number. 5) Collect production gas and bradenhead gas samples during the bradenhead test. 6) Analyze gas samples for for composition (C1 through C12) and stable isotopes of methane, ethane, and propane (Isotech Laboratories NG-2 analysis or similar). Submit analytical results on a Form 4 (Sundry Notice), and notify Dave Andrews with the eForm Document Number.
EngineerForm: (04)
400481684
11/07/2013
Operator has yet to comply with Conditions of Approval #3 on COGCC Document No. 400439479, which states, "3) Submit new Form 5 (Drilling Completion Report) with remedial cement tickets and remedial CBL within 30 days of the work, and notify Dave Andrews with the eForm Document Number." Operator is hereby required to submit this information no later than 12/7/2013.
EngineerForm: (04)
400594171
04/28/2014
1) Perform a Bradenhead Test and record results on Form 17 (Bradenhead Test Report); submit Form 17 and new wellbore diagram within 10 days after the test, and notify Dave Andrews with the eForm Document Number. 2) Collect production gas and bradenhead gas samples during the bradenhead test. 3) Analyze gas samples for for composition (C1 through C12) and stable isotopes of methane, ethane, and propane (Isotech Laboratories NG-2 analysis or similar). Submit analytical results on a Form 4 (Sundry Notice), and notify Dave Andrews with the eForm Document Number.
 
COGIS - Best Management Practice Results
No records to display.