| Engineer | Form: (06) 400643568 09/09/2014 | 1) Properly abandon flowlines per Rule 1103. File electronic Form 42 when flowline abandonment is complete.
3) After casing pressure test (step 3) contact NW Area Engineer Craig Burger for concurrence with cement plug across HIC.
3) Provide accurate final wellbore diagram after plugging. |