COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403915537
10/23/2024
Submit an updated WBD within 60 days
EngineerForm: (04)
403915537
10/23/2024
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by ECMC Rules a new bradenhead test and sundry must be filed.
EngineerForm: (04)
403970641
02/12/2025
Include full well details such as formations and cement on the next sundry update
EngineerForm: (04)
404600839
04/27/2026
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Bradenhead gas is not to be vented to the atmosphere. Shut in bradenhead pressure shall not exceed threshold pressure. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. 3. No later than 2/24/2027, (12 months after the most recent BH test) conduct a bradenhead test, submit a Form 17 within ten days of the test. Within 60 days of conducting the Bradenhead test, submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and SCADA pressure data. 4. If a sample has not been collected from surface casing within the last twenty-four months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples. If a sample has not been collected from production gas, collect production gas samples for laboratory analysis. Operator may submit a production gas from an adjacent well if on a multi-well pad. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
EngineerForm: (04)
404445860
04/27/2026
COAs on updated sundry 404600839 **no pressure data attached - include pressure data future BH sundries for this well
 
COGIS - Best Management Practice Results
No records to display.