Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-06224FEDERAL-RULISON
122
TEP ROCKY MOUNTAIN LLC
96850
PR
1/1/2020
RULISON
75400
GARFIELD  045
SESW 12 6S94W 6
311534View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403445096
10/24/2023
1) If the bradenhead pressure exceeds the adjusted threshold pressure, submit a new Form 4 Sundry -Bradenhead Plan 2) Monitor fluid level in bradenhead annulus and report fluid level increase changes to the ECMC 3) Submit an updated WBD 4) Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. Copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
 
COGIS - Best Management Practice Results
No records to display.