Engineer | Form: (04 ) 403054052 8/16/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Complete subsequent Form 21 MITs in accordance with the timelines set forth in Rule 417 once the gas plant is back operational. If well is not returned to production following gas plant repairs, an MIT is due by 05-31-2027
|