WELL05-043-06229Magellan
1
AUSCO PETROLEUM INC
10412
PR
8/1/2020
WILDCAT
99999
FREMONT  043
NWNE 18 20S69W 6
443255View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400852028
07/13/2015
1) Provide 48 hour notice of spud via electronic Form 42. 2) Comply with Rule 321. Run and submit directional survey from TD to surface. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. 3) If well is a dry hole, set 50 sks cement ½ out, ½ in surface casing, 10 sks cement top of surface casing, cut casing 4’ below GL, weld on plate, 5 sks cement in rat hole & 5 sks cement in mouse hole.
EngineerForm: (04)
401278824
05/09/2017
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to vent/flare annually to COGCC on Form 4 (Sundry Notice). State the estimated volume (rate), duration, H2S content, and describe justification (reason) for venting/flaring. Provide gas composition analysis including H2S with each Sundry Notice. 3) Report vented/flared volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE.
OGLAForm: (04)
401276216
05/26/2017
This Location lies within Sensitive Wildlife Habitat and within the Central Flyway for migratory birds. All pits associated with this Location shall be adequately fenced and netted in compliance with Rule 902.d.
OGLAForm: (04)
401276216
05/26/2017
The COGCC will grant a one-time only, extension of the use of the Marco Polo #1 Drilling Pit. The Drilling Pit shall be closed no later than November 15, 2017.
EngineerForm: (04)
401982985
02/25/2022
After November 2, 2020, gas venting is not permitted.
EngineerForm: (04)
401982985
02/25/2022
Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022.
EngineerForm: (04)
401724493
02/25/2022
Venting is not allowed after November 2, 2020.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02 )
400852028
9/18/2015
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup will be required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offiste for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trahs, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.
Dust controlForm: (02 )
400852028
9/18/2015
Aus-Tex will apply appropriate measures to ensure dust control and mitigate potential impacts resulting from dust emissions
Drilling/Completion OperationsForm: (02 )
400852028
9/18/2015
Open-hole Resistivity Log with Gamma Ray Log will be run from TD into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, Completion Report, will list all logs run and have those logs attached.