| Engineer | Form: (02) 400852028 07/13/2015 | 1) Provide 48 hour notice of spud via electronic Form 42.
2) Comply with Rule 321. Run and submit directional survey from TD to surface. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
3) If well is a dry hole, set 50 sks cement ½ out, ½ in surface casing, 10 sks cement top of surface casing, cut casing 4’ below GL, weld on plate, 5 sks cement in rat hole & 5 sks cement in mouse hole.
|
| Engineer | Form: (04) 401278824 05/09/2017 | 1) Venting or flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to vent/flare annually to COGCC on Form 4 (Sundry Notice). State the estimated volume (rate), duration, H2S content, and describe justification (reason) for venting/flaring. Provide gas composition analysis including H2S with each Sundry Notice.
3) Report vented/flared volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
|
| OGLA | Form: (04) 401276216 05/26/2017 | This Location lies within Sensitive Wildlife Habitat and within the Central Flyway for migratory birds. All pits associated with this Location shall be adequately fenced and netted in compliance with Rule 902.d. |
| OGLA | Form: (04) 401276216 05/26/2017 | The COGCC will grant a one-time only, extension of the use of the Marco Polo #1 Drilling Pit. The Drilling Pit shall be closed no later than November 15, 2017. |
| Engineer | Form: (04) 401982985 02/25/2022 | After November 2, 2020, gas venting is not permitted. |
| Engineer | Form: (04) 401982985 02/25/2022 | Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022. |
| Engineer | Form: (04) 401724493 02/25/2022 | Venting is not allowed after November 2, 2020. |