COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06)
401089912
08/23/2016
Need 5A showing well TA in 7/30/2013 before subsequent 6 is approved.
EngineerForm: (06)
401089912
09/20/2016
NOTE: Changes in plugging procedure. CBL to be run prior to plugging to verify stage tool setting depth and existing coverage - submit to COGCC for verification of plugging orders. Additional plugs required. 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 1750’ plug: pump plug and displace - tag plug – must be 1600’ or shallower. If surface casing plug is perforated at 530', pumped and tagged - must be 280’ or shallower and provide 10 sx plug at the surface (inside and outside of casing). Leave at least 100’ cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
EngineerForm: (06)
401089912
09/20/2016
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days.
EngineerForm: (06)
401581544
09/26/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401581544
09/26/2019
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 530' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 281' or shallower and provide 10 sack plug at surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. 7) After placing the shallowest hydrocarbon isolating plug (7000'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations.
EngineerForm: (06)
401581544
09/26/2019
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required, and the COGCC engineering staff must be contacted. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for a confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06)
401581544
09/26/2019
CBL to be run prior to plugging to verify stage tool setting depth and existing cement coverage - submit to COGCC for verification of plugging orders.
 
COGIS - Best Management Practice Results
No records to display.