Engineer | Form: (04 ) 402469986 10/1/2020 | Prior to adding perfs, a bradenhead test shall be performed. If the beginning pressure isgreater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements before proceeding. The Form 17 shall be submitted within 10 days of the test. |