Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-014-13049SHANNON ROBERTS
26-5
BLUE CHIP OIL INC
8840
PR
4/1/2025
WATTENBERG
90750
BROOMFIELD/BROOMFIELD  014
NWNE 26 1N68W 6
321537View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403973957
11/01/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Community Outreach and NotificationForm: (04 )
403364880
4/19/2023
Blue Chip has sent out the following notifications: RBU Notifications – Sent 04/04/2023 LGD (Broomfield) Notification – Send 03/14/2023 Broomfield will be notified of the updated MIRU schedule as soon as these sundries are approved and dates are finalized.
PlanningForm: (04 )
403364880
4/19/2023
LIGHTS: operator will conduct operations during daylight hours only.
Storm Water/Erosion ControlForm: (04 )
403364880
4/19/2023
Operations will not extend into the ditch. Standard stormwater/SPCC protocols will be followed and will install straw waddles or other BMPS if necessary
Dust controlForm: (04 )
403364880
4/19/2023
Dust suppression: Monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehical trafic on the access road.
Noise mitigationForm: (04 )
403364880
4/19/2023
Operator will comply with maximum permissable noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary.
Odor mitigationForm: (04 )
403364880
4/19/2023
Nuisance odors are not anticipated for the operation, however, will be monitored and treated as necessary. Daily Operation summaries will document to ensure all BMPs and COAs are met