Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-014-12404BURY CRANDELL C UNIT
2
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PA
10/31/2019
WATTENBERG
90750
BROOMFIELD/BROOMFIELD  014
NWNW 23 1N68W 6
321534View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400767427
03/20/2015
NOTE: Changes to procedure Provide remedial cement 200’ above Sussex (minimum coverage 4850’ to 4550’), and 1250’ into the surface casing shoe. Casing should be pressure tested to 1000 psi after annular fill has been pumped. Verify remedial cement coverage with cement bond log.
EngineerForm: (05)
400846489
08/11/2017
• CBL attached to the form 5 does not verify annular fill between 4870’ and 4390’, please clarify. Operator indicates that they don't have a CBL on file to verify this annular fill cement in this area. A CBL will be required prior to plugging this well, to verify cement coverage in this area.
EngineerForm: (06)
401862083
03/21/2019
Plugging • Provide 48 hour notice of plugging MIRU via electronic Form 42. • Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from COGCC is obtained. • COGCC does not have a current Form 17 on file. If there is any bradenhead pressure reported on the pre-plugging Form 17, contact COGCC Area Engineer for revised plugging orders prior to continuing with plugging operations. • COGCC Change: Move CIBP at 50’ to 80’, cement to surface. • Submit gyro survey with Form 6 SRA if available. • Check for fluid migration or shut-in pressure on the well prior to pumping any plug(open hole, annular or casing) that isolates deepest aquifer or the surface casing shoe (whichever is deeper). Contact COGCC Area Engineer for revised plugging orders if well is not static at this time prior to continuing with plugging operations. • Tag required if the shoe plug, or combined stub/shoe plug, is not circulated to the surface. Shoe plug shall be placed as specified herein and the top of cement must be a minimum 50’ into the shoe, or 50’ above the stub (if not cut below the shoe), whichever is shallower. • Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. All other cement plugs, without mechanical isolation, shall have at least 100' of cement left in the casing. Confirm cement to surface in all strings during cut and cap. • Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. • Document COAs have been met on the Form 6 SRA.
EngineerForm: (06)
401862083
03/21/2019
Bradenhead Testing • Prior to the start of plugging operations, a bradenhead test shall be performed and reported if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. • If any of the following conditions exist then sampling of all fluids is required and sampling methods shall comply with Operator Guidance – Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling as found on the COGCC website, cogcc.state.co.us. 1) The initial pressure measurement on the bradenhead is greater than 25 psi, prior to blowing down any liquid or gas from the bradenhead valve, or 2) Pressure remains at the conclusion of the test, or 3) Any liquids are present anytime during the test. If so, then stop the test as soon as liquids are present and sample before resuming the test. • Form 17 Bradenhead Test Report shall be submitted within 10 days of the test. • If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. Submit via a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website under Regulation => Forms => Form 43 COGCC Environmental Database.
EngineerForm: (06)
401862083
03/21/2019
Venting Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
No records to display.