COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
404328857
08/29/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Prior to placing cement above the base of the Upper Pierre (1180') : verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) Pump surface casing shoe plug at 1000' only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 840' or shallower and provide a minimum of 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
404328857
08/29/2025
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06)
404328857
08/29/2025
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. If there is a need for sampling, contact ECMC engineering for verification of plugging procedure.
OGLAForm: (06)
404328857
09/03/2025
Operator committed to the following Best Management Practices under the Technical Detail/ Comments section on the Submit Tab: Operator will use secondary containment for all tanks and other liquid containment.
OGLAForm: (06)
404328857
09/03/2025
Notification will be given to any adjacent building unit occupants within 1,000 feet of the wellhead of planned P&A start date.
OGLAForm: (06)
404328857
09/03/2025
Prior to commencing operations, the operator will post signs in conspicuous locations at intersections that will remain in place throughout the duration of the plug and abandonment activities. The signs will indicate plugging and abandonment operations are being conducted, the well name, well, and the applicable contact information. Signs will be placed so as not to create a potential traffic hazard.
OGLAForm: (06)
404328857
09/03/2025
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors, odors and noise from plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
403557092
10/24/2023
Lights: Operator will conduct operations during daylight hours only.
Community Outreach and NotificationForm: (04 )
403557092
10/24/2023
Prior to commencing operations, the Operator will provide an informational sheet to the owners/occupants of RBUs that within 2,000 feet and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations.
Dust controlForm: (04 )
403557092
10/24/2023
Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehicle traffic traveling on the access road.
Noise mitigationForm: (04 )
403557092
10/24/2023
Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary.
Odor mitigationForm: (04 )
403557092
10/24/2023
Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met.