Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-009-06497S E CAMPO UNIT/LANSING D
1202W/302W
MURFIN DRILLING COMPANY INC
61650
TA
5/1/2023
CAMPO
9850
BACA  009
SWSE 1 35S46W 6
321115View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
402890993
01/24/2022
This approval is good for one year and a new application must be made before December 7, 2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402890993
01/24/2022
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402890993
01/24/2022
Update production reporting from February, 2021 to the present to reflect TA status and not SI.
EngineerForm: (04)
402890993
01/24/2022
Submit a Form 5A indicating when and how the well was TA’d.
EngineerForm: (04)
403578201
11/21/2023
•This ER IJ well is designated out of service and cannot be returned to operation. •Monthly monitoring and annual testing of the bradenhead shall continue until this well is plugged. •Production reporting needs to be corrected to reflect the TA status from the time the well became TA as reported on the Form 5A, by 12/15/23. (Correct 4/2023)
 
COGIS - Best Management Practice Results
No records to display.