Engineer | Form: (02 ) 402729252 8/27/2021 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
Engineer | Form: (02 ) 402729252 8/27/2021 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with a cement bond log. |
Engineer | Form: (04 ) 403800119 7/11/2024 | 1) Within 6 months of a Well becoming Inactive action must be taken. No later than July 1, 2025. A. Be plugged and Abandoned, B. Return to production so that it is no longer an Inactive Well, C. Have an approved Form 5B, Inactive Well Notice, D. Be designated as Out of Service by submitting a Form 6A, Out of Service Designation. 2) A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval. 3) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status of temporarily abandoned. |