Engineer | Form: (02 ) 401250066 7/21/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
Engineer | Form: (02 ) 401250066 7/21/2017 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|
Engineer | Form: (02 ) 401250066 7/21/2017 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures
that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option
4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT
CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic
stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation.
Operator will assure that the stimulation plan is revised to reduce stimulation job size and rate within 1,500' of the abandoned vertical well in order to reduce the frac half-length and therefore the potential effects on the Sunstate #1. 005-06575
|